Please be advised that parking lot rehabilitation work is taking place at the Aurora Family Leisure Complex (AFLC), located at 135 Industrial Parkway North. Work is expected to continue until September 9, 2026, weather and site conditions permitting.

The work includes:

  • Removal and replacement of sections of curb and sidewalk
  • Restoration of disturbed areas
  • Milling/grinding of the existing parking lot surface
  • Adjustment of catch basins
  • Placement of a new asphalt surface
  • Line painting and final site cleanup

The current construction schedule is as follows:

Activity

Scheduled Dates

Curb removal and replacement

August 4–12

Sidewalk removal and replacement

August 13–18

Restoration

August 19

Parking lot milling/grinding

August 20–24

Catch basin adjustments

August 25–26

Surface asphalt paving

August 27–September 4

Line painting

September 7–8

Cleanup and demobilization

September 9

Access and Parking

The AFLC will remain accessible during construction; however, users should expect temporary changes to parking, vehicle circulation and pedestrian routes as work progresses through the site. Portions of the parking lot may be temporarily unavailable to accommodate construction activities.

Traffic control measures and signage will be in place to direct motorists and pedestrians around active work areas. Please use caution when travelling through the site and follow all posted signage and directions from construction personnel.

The Town will work with the contractor to minimize disruptions to facility users, Aurora Youth Soccer Club activities and surrounding residents wherever possible.

Please note that the schedule is subject to change due to weather, unforeseen site conditions or construction requirements.

We appreciate everyone’s patience and cooperation while these improvements are completed.