Aurora Library Square - Phase 2 ESA Onsite Investigation

Message

Please note the following days the Town of Aurora has scheduled to complete a Phase 2 Environmental Site Assessment, which includes a site investigation requiring boreholes to be drilled, for the Library Square project.

Tentative schedule:

The tentative schedule is as follows but could change especially for work next Monday since we are still determining the availability of the borehole driller for that day:

  • Friday May 10  - 7:30 a.m. to noon borehole drilling in the Cultural Building; noon to late afternoon boreholes in upper parking lot and demolished building area.
  • Monday May 13 – 7:30am to 1 p.m. borehole drilling in the basement of the Library. 1 p.m. to late afternoon three boreholes outside by sidewalk on the west side of the library.

Safety

Please be advised all of the necessary safety precautions are being taken buring the investigation.

if there are any concerns with safety or noise while the work is being done, please contact Soil Engineers Ltd. at (416) 754-8515 ext. 1009